Performing works on the reconstruction of Vuka Karadžića Street
Contractor:
GP KOMPRESOR ING
Projected task:
Works on the replacement of the pavement structure, construction of atmospheric sewerage with a collector, asphalting of the roadway and construction of sidewalks from behaton slabs.
Investor:
Valjevo City Administration
Construction period:
2021 – 2022
Performing works on the reconstruction of Vuka Karadžića Street
Works on the replacement of the pavement structure, construction of atmospheric sewerage with a collector, asphalting of the roadway and construction of sidewalks from behaton slabs.