References

Category:

Performing works on the reconstruction of Vuka Karadžića Street

Contractor:

GP KOMPRESOR ING

Projected task:

Works on the replacement of the pavement structure, construction of atmospheric sewerage with a collector, asphalting of the roadway and construction of sidewalks from behaton slabs.

Investor:

Valjevo City Administration

Construction period:

2021 – 2022

Performing works on the reconstruction of Vuka Karadžića Street

Contractor:

GP KOMPRESOR ING

Projected task:

Works on the replacement of the pavement structure, construction of atmospheric sewerage with a collector, asphalting of the roadway and construction of sidewalks from behaton slabs.

Investor:

Valjevo City Administration

Construction period:

2021 – 2022